THE POWER OF CONNECTION
news

Events

FIRE FIGHTING AND FIRE EXPLOITATION AT SCS BUILDING
30/11/2019
According to the annual plan, to ensure the fire prevention and fighting system ("fire protection") at SCS Building works effectively, stably and improve the skills to handle situations of firefighting forces at the facility and tenants. On November 30, 2019, SCS's Management Board in collaboration with the unit of Police Department of Fire Prevention and Rescue Rescue - Ho Chi Minh City Police organized a rehearsal of fire fighting and rescue plan at the SCS Building
 
The situation in which the fire assumed to occur occurred at 9:30 am on the 2nd floor of the building. Sparks appeared in the office and set fire, triggering automatic fire detectors. The electrical and air conditioning systems in the building were shut down, and the exhaust fan in the area where the fire occurred was started.
Immediately, the building's fire alarm system functioned like a siren, a fire alarm broadcasted throughout the building, the elevators automatically ran down to the G floor and opened the door.
 
At the time of fire alarm, the Building Management Board immediately implemented the fire fighting and rescue plan for all staff members and visitors using the services present in the building. Firefighting forces at the building's base guide cadres and emergency personnel to escape according to the stairs and gather at a safe gathering place, and inspect each floor of the office to avoid people trapped. At the gathering place, the evacuation team checked the number of personnel and customers and properties, supporting the injured to go to emergency.
 
At the same time, the Building Management Board has cooperated with the Fire Prevention and Rescue Police Department - Ho Chi Minh City Police Department to organize the implementation of fire fighting and rescue plans, property rescue and emergency exit.
Right after receiving the news, the Fire Prevention and Rescue Police force - Ho Chi Minh City Police deployed forces and rescue.
 
After 20 minutes of urgently deploying, ensuring safety, the entire rehearsal was completed in accordance with the process, meeting the basic requirements set out, no serious damage to people and property occurred. The fire fighting coordination units had a meeting to discuss and draw experience after the rehearsal.
 
Firefighting drills at SCS Building are regular activities to check the effectiveness of firefighting work as well as fire fighting equipment system in the building. At the same time, through this practical drill will improve the awareness of fire prevention and fighting of each official in the building, the ability to handle fire and explosion situations, organize the escape of firefighting forces at grassroots level. and the professional fire fighting and rescue coordination of professional fire fighting forces.
 
Some pictures of the rehearsal:



Other posts